{"id":854,"date":"2026-10-06T15:47:30","date_gmt":"2026-10-06T13:47:30","guid":{"rendered":"https:\/\/e-car.day\/?p=854"},"modified":"2026-10-01T15:54:36","modified_gmt":"2026-10-01T13:54:36","slug":"how-megacities-are-preparing-infrastructure-for-electric-cars","status":"publish","type":"post","link":"https:\/\/e-car.day\/?p=854","title":{"rendered":"How Megacities Are Preparing Infrastructure for Electric Cars"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Electric cars are becoming a normal part of city traffic, but replacing gasoline vehicles with EVs involves far more than installing chargers in parking lots. Large metropolitan areas must rethink curb space, electricity distribution, apartment parking, public garages, taxi infrastructure, fleet depots, zoning rules, payment systems, and even the way new buildings are wired.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The scale of that transition is already visible. According to the International Energy Agency, the global stock of public charging points exceeded <strong>7 million by the end of 2025<\/strong>, after nearly 1.8 million new points were added during the year. Public charging capacity is also becoming faster, with rapid and ultra-fast equipment representing a growing share of new installations.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Yet megacities face a particular challenge. Millions of urban residents live in apartments and park on streets rather than in private garages. Taxis, delivery vans, ride-hailing vehicles, buses, and commercial fleets also need considerably more energy than an average privately owned car.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The cities preparing most seriously for electric mobility are therefore building an entire charging ecosystem rather than simply increasing the number of plugs.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Why Megacities Need a Different EV Strategy<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Suburban EV ownership is comparatively straightforward when a driver has a driveway or private garage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The vehicle can remain connected overnight, allowing a relatively inexpensive low-power charger to replenish the battery while the electricity network is under less pressure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Dense cities are different.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A resident may park several blocks from home. An apartment building may have an underground garage with limited electrical capacity. A taxi may cover hundreds of miles during a working day. A delivery van cannot necessarily remain plugged in for eight hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Urban charging infrastructure must therefore support several completely different behaviors.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cities need combinations of:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Residential overnight charging<\/li>\n\n\n\n<li>Curbside charging<\/li>\n\n\n\n<li>Workplace charging<\/li>\n\n\n\n<li>Public parking-garage chargers<\/li>\n\n\n\n<li>Rapid charging hubs<\/li>\n\n\n\n<li>Taxi and ride-hailing charging<\/li>\n\n\n\n<li>Commercial fleet depots<\/li>\n\n\n\n<li>Bus and truck charging<\/li>\n\n\n\n<li>Highway and arterial-road stations<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The International Energy Agency notes that housing patterns strongly influence public charging demand. In dense Chinese cities, for example, limited private parking has contributed to particularly heavy reliance on public charging. Amsterdam and other compact European cities face similar pressures because large numbers of residents lack dedicated home parking.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Curbside Charging Is Becoming Urban Infrastructure<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One of the most visible changes is happening directly on city streets.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Curbside chargers allow drivers without private parking to recharge while their cars are parked normally. Depending on the installation, electricity can come from underground connections, nearby distribution infrastructure, street furniture, or purpose-built charging posts.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New York City is expanding this approach.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In August 2026, the city&#8217;s Department of Transportation announced that it would install <strong>600 additional curbside charging points across all five boroughs during the following three years<\/strong>. The expansion is intended particularly for dense neighborhoods where drivers lack private charging options and for high-mileage professional drivers. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New York&#8217;s experience also demonstrates why urban charging cannot be treated purely as an electrical-engineering problem.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Every charger occupies valuable curb space. Cities must decide whether that space should serve electric cars, deliveries, buses, bicycles, disabled drivers, taxis, outdoor businesses, or conventional parking.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">There is also the problem of vehicles occupying charging spaces after charging has finished.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>In a megacity, the curb is already a scarce resource. Electrification adds another competing use for it.<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Successful deployment therefore requires parking rules, enforcement, pricing, signage, maintenance, and careful site selection alongside the hardware itself.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">London Is Combining Slow Chargers With Rapid Hubs<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">London provides another example of a mixed infrastructure strategy.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As of January 2026, London had 27,986 public charging points, accounting for more than 30 percent of the United Kingdom&#8217;s public charging network. The city is working toward more than 40,000 public charge points by 2030. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">However, simply counting chargers does not reveal how useful a network actually is.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">London needs slower neighborhood charging for residents who park overnight, but it also needs high-power facilities for taxis, vans, ride-hailing vehicles, and other drivers who cannot afford to leave a vehicle connected for many hours.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">City Hall estimates that London could need up to <strong>4,000 rapid or ultra-rapid charging points by 2030<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Transport authorities are consequently developing rapid-charging hubs on suitable public land.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These sites resemble modern fuel stations more than traditional curbside chargers. Several vehicles can charge simultaneously, and a driver may recover substantial range during a short stop.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This layered approach is likely to become common elsewhere.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Low-power chargers provide convenient energy where vehicles already spend hours parked; high-power hubs provide rapid energy where vehicle utilization matters more than parking time.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Singapore Is Building Charging Into Residential Infrastructure<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Singapore faces a different urban environment but a similar fundamental problem: large numbers of residents live in high-density housing.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Rather than assuming that EV owners will install chargers individually, the government has integrated charging deployment into public residential parking.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Singapore has a national target of <strong>60,000 EV charging points by 2030<\/strong>, including 40,000 in public car parks and 20,000 on private premises. By March 2026, approximately 30,500 charging points had already been deployed.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Chargers are now installed in nearly every Housing and Development Board car park, while authorities monitor actual utilization and can add capacity at locations where demand becomes high.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Singapore is also planning at least one fast-charging hub in every public-housing town by the end of 2027.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The model illustrates an important principle of urban EV infrastructure.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cities do not necessarily need to install maximum charging capacity immediately. They can build electrical foundations, monitor demand, and expand the number of charging points as EV ownership increases.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That avoids expensive equipment remaining underused during the early stages of electrification.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Apartment Buildings Must Become EV-Ready<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Retrofitting an existing apartment garage can be surprisingly expensive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The charger itself may be only a small part of the project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A building may also require:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>New electrical panels<\/li>\n\n\n\n<li>Higher-capacity cables<\/li>\n\n\n\n<li>Transformers<\/li>\n\n\n\n<li>Metering equipment<\/li>\n\n\n\n<li>Fire-safety modifications<\/li>\n\n\n\n<li>Internet connectivity<\/li>\n\n\n\n<li>Parking-space wiring<\/li>\n\n\n\n<li>Load-management software<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This is why many cities and national governments increasingly require new developments to be <strong>EV-ready<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Instead of installing a charger at every parking space immediately, developers can install cable conduits, electrical capacity, or pre-wiring during construction.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The European Union&#8217;s building rules increasingly incorporate this principle because preparing parking areas during initial construction is far cheaper than tearing into finished structures later.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The IEA specifically identifies pre-cabling requirements as an important tool for avoiding costly future retrofits. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For cities expecting millions of electric vehicles over several decades, that may be one of the least visible but most important investments.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Electricity Grids Must Be Upgraded Before Chargers Arrive<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A row of twenty ordinary chargers may be manageable for an existing electrical connection.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A hub containing dozens of ultra-fast chargers can require power comparable to a significant commercial or industrial facility.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The difference becomes even more important when electric buses, delivery fleets, and trucks are involved.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Installing the charging equipment before adequate electrical capacity exists can produce delays, expensive upgrades, or chargers that cannot operate at their intended output.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Utilities therefore increasingly work with cities years in advance.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Grid planners can identify neighborhoods where EV adoption is likely to rise, reinforce substations, install transformers, and increase distribution capacity before demand becomes critical.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The problem is particularly difficult because EV charging is geographically concentrated.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A city might have enough total electricity generation but still experience severe congestion in a particular neighborhood if hundreds of cars begin charging simultaneously after work.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The main challenge is often not producing enough electricity; it is delivering enough electricity to the correct street, garage, or depot at the correct time.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Smart Charging Can Reduce the Need for Grid Expansion<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One solution is not simply building larger electricity networks but using existing infrastructure more intelligently.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Smart chargers can adjust power according to grid conditions.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Suppose 100 vehicles arrive at an apartment garage at 7 p.m.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">They do not necessarily need maximum power immediately. Most may remain parked until 7 a.m.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A management system can distribute available electricity across the vehicles during the night, prioritizing cars that need to leave earlier while reducing total peak demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Electricity tariffs can reinforce the same behavior by making charging cheaper during periods of low demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Eventually, bidirectional charging could allow some vehicles to return electricity to buildings or the grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The IEA considers smart charging, interoperability, and vehicle-to-grid integration important tools for reducing pressure on electrical systems as EV adoption grows.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This creates a major change in the relationship between transport and electricity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">An electric car is not merely another appliance. It contains a large battery that may remain connected to the grid for many hours.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Cities Are Planning Around Taxis and Ride-Hailing Fleets<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Professional drivers create disproportionately large charging demand.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A private vehicle might travel only a few dozen miles per day. A taxi or ride-hailing vehicle can remain on the road for most of a working shift.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">These vehicles therefore need strategically located rapid chargers with reliable availability.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">New York provides a clear example.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">In 2026, the city continued expanding rapid-charging facilities partly to support professional drivers. A new eight-charger facility opened in Flushing, while additional stations were scheduled across Queens, Brooklyn, and the Bronx. Sixty-six fast chargers were planned at ten municipal parking facilities through the broader program. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">London similarly identifies taxis and commercial vans as major users of rapid charging.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For these drivers, the calculation is economic.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A twenty-minute charging stop is lost working time. Waiting in a queue for another twenty minutes can be even more expensive.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That means professional charging infrastructure must be evaluated not just by charger count, but by reliability, power, utilization, and waiting time.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Data Determines Where Chargers Should Go<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Early charging networks were sometimes installed where land or funding was available rather than where drivers actually needed them.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Modern urban planning is becoming more data-driven.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Cities can analyze:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>EV registrations<\/li>\n\n\n\n<li>Parking patterns<\/li>\n\n\n\n<li>Apartment density<\/li>\n\n\n\n<li>Existing charger utilization<\/li>\n\n\n\n<li>Taxi activity<\/li>\n\n\n\n<li>Commercial traffic<\/li>\n\n\n\n<li>Electrical grid capacity<\/li>\n\n\n\n<li>Income and demographic data<\/li>\n\n\n\n<li>Traffic volumes<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">New York&#8217;s curbside program, for example, considers projected charging demand, geographic distribution, and community feedback when selecting potential sites.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Singapore monitors usage at public residential car parks and adds chargers in high-demand locations when electrical capacity permits.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This approach becomes increasingly important as EV adoption moves beyond wealthy early adopters.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If chargers are concentrated only in affluent districts, residents elsewhere may face a practical barrier to purchasing electric cars.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Charger Reliability Is Becoming as Important as Charger Quantity<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">A charging point displayed on a map is not useful if it is broken, occupied, inaccessible, or unable to process payment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As networks mature, cities and charging companies are focusing more strongly on uptime and user experience.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Drivers increasingly expect:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>Accurate availability information<\/li>\n\n\n\n<li>Simple payment<\/li>\n\n\n\n<li>Transparent prices<\/li>\n\n\n\n<li>Reliable connectors<\/li>\n\n\n\n<li>Working equipment<\/li>\n\n\n\n<li>Multiple payment options<\/li>\n\n\n\n<li>Compatible charging standards<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">The IEA emphasizes that charging services must be easy to use, reliable, interoperable, and transparently priced if public infrastructure is to support mass EV adoption. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That is a significant shift.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The first phase of EV infrastructure was largely about installing chargers. The next phase is about making charging feel as dependable as other mature urban services.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Urban Infrastructure Is Expanding Beyond Passenger Cars<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Passenger cars receive most of the attention, but megacities must also electrify buses, delivery vans, municipal fleets, refuse trucks, and eventually heavier commercial vehicles.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Those vehicles create different infrastructure requirements.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Electric buses may return to large depots at night. Delivery fleets may require hundreds of chargers at logistics centers. Heavy trucks may need very high-power charging that can place substantial demands on the local electricity grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The IEA expects the electrification of heavy-duty vehicles to require major increases in dedicated charging capacity, making coordination between transport authorities, utilities, depot owners, and grid operators increasingly important. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For city planners, this means passenger-car charging cannot be designed in isolation.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">There Is No Universal Number of Chargers a City Needs<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">One of the most important expert conclusions comes from researchers at the International Council on Clean Transportation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Their work on urban EV infrastructure emphasizes that <strong>there is no universal charger-to-vehicle ratio that works for every city<\/strong>. Charging requirements depend on local housing, commuting behavior, vehicle use, parking arrangements, EV adoption, and grid conditions. <\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That explains why Amsterdam, London, Singapore, New York, and dense Chinese cities can pursue very different strategies while working toward the same objective.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A city dominated by detached houses may rely heavily on private home charging.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A city of apartment towers may need shared parking chargers.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A city with large taxi fleets may need dozens of rapid hubs.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A dense historic center may favor curbside charging while protecting limited street space.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Good EV infrastructure is not about maximizing the number of chargers. It is about putting the correct type of charging in the places where vehicles already spend time.<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Conclusion<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Megacities are discovering that preparing for electric cars requires changes far beyond the automobile itself.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">London is combining extensive neighborhood charging with rapid hubs. New York is expanding curbside infrastructure and municipal fast-charging facilities. Singapore is integrating chargers directly into high-density residential parking. Amsterdam and other European cities demonstrate why dense neighborhoods with limited private parking require especially strong public networks.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Behind those visible chargers sits an even larger transformation.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Electrical grids need reinforcement. Apartment buildings must become EV-ready. Utilities need real-time load management. Streets require new parking rules. Cities must coordinate charging for taxis, vans, buses, and municipal fleets while ensuring that infrastructure reaches neighborhoods without private garages.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Global public charging is already expanding rapidly, but the next phase will be less about installing individual charging posts and more about <strong>turning charging into a dependable part of urban infrastructure<\/strong>.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The most successful cities will not necessarily be those with the largest raw charger count. They will be the ones where charging becomes almost invisible to the driver: available near home, reliable during a journey, fast when necessary, affordable, compatible, and integrated intelligently with the electricity grid.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>The electric-car transition will ultimately depend as much on the design of cities and power networks as on the technology inside the vehicles themselves.<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Electric cars are becoming a normal part of city traffic, but replacing gasoline vehicles with EVs involves far more than installing chargers in parking lots. Large metropolitan areas must rethink&hellip;<\/p>\n","protected":false},"author":25,"featured_media":856,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_sitemap_exclude":false,"_sitemap_priority":"","_sitemap_frequency":"","footnotes":""},"categories":[25,21,13,32],"tags":[],"class_list":["post-854","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-brand-loyalty-and-customer-engagement","category-future-of-electric-vehicles","category-future-transportation-technologies","category-sustainable-ev-technologies"],"_links":{"self":[{"href":"https:\/\/e-car.day\/index.php?rest_route=\/wp\/v2\/posts\/854","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/e-car.day\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/e-car.day\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/e-car.day\/index.php?rest_route=\/wp\/v2\/users\/25"}],"replies":[{"embeddable":true,"href":"https:\/\/e-car.day\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=854"}],"version-history":[{"count":1,"href":"https:\/\/e-car.day\/index.php?rest_route=\/wp\/v2\/posts\/854\/revisions"}],"predecessor-version":[{"id":857,"href":"https:\/\/e-car.day\/index.php?rest_route=\/wp\/v2\/posts\/854\/revisions\/857"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/e-car.day\/index.php?rest_route=\/wp\/v2\/media\/856"}],"wp:attachment":[{"href":"https:\/\/e-car.day\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=854"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/e-car.day\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=854"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/e-car.day\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=854"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}